SEARCH
0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Prev | Current Page 99 | Next

Various

"The American Architect and Building News, Vol. 27, No. 733, January 11, 1890"

Should the actual
cost exceed the approximate cost, we will make the necessary changes in
the plans, so as to reduce the cost, should you so desire, without extra
charge. Changes made in plans from other causes, charged for according
to time consumed.
Travelling expenses and other necessary disbursements in addition to
fee for services.

PAYMENTS.
Payments shall be made as follows: Upon completion of the preliminary
sketches, 1 per cent of estimated cost; upon completion of the general
drawings and specifications, an additional 1-1/2 per cent of estimated
cost; upon completion of details an additional 1 per cent of estimated
cost; and upon completion of the work, the charge for supervision or
inspection. At that time, also, any differences between the percentage
upon the estimated and actual cost is to be settled, and any deficiency
is to be paid or excess credited.
Travelling expenses and other necessary disbursements are payable when
incurred.
In case contracts are not entered into for the work within six months
after the drawings are ready for contractors to estimate, payment shall
be made for the work done at the rates herein before specified, computed
upon the estimated cost. Provided, however, that if at any subsequent
time the plans and specifications prepared by us, are used and the
actual cost exceeds the estimated cost, compensation upon such excesses,
shall be made at the rates aforesaid.


Pages:
87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111